What problem did the client have?
The existing areas within Unit 10, including the bottling, powder room, filling lab and packing areas, required refurbishment and some reconfiguration to better suit the client’s manufacturing operations. The spaces needed to be refreshed and upgraded, while improving the durability, safety and practicality of the working environment.
Which services did we provide the client with?
- Partitioning wall and ceiling removals
- Cladding works
- Installation of steel fire doors and new internal timber doors
- Removal and installation of new concrete bunding
- Partitioning works
- Doorway blocking up
- Replace existing window glazing with new fire rated glass
- New suspended ceilings and insulation works
- Upgraded hot water systems
- Full room redecoration
- Vinyl flooring
- Forklift guide rail and hoop barriers
How did these services help to solve the problem they had?
By removing and reconfiguring the existing partitions, ceilings and doorways, we were able to adapt the spaces around the client’s manufacturing requirements. New suspended ceilings and insulation, upgraded hot water systems, durable vinyl flooring and full redecoration helped create a cleaner, more practical environment across the different production areas.
Fire-rated doors and glazing, new cladding and concrete bunding addressed the safety and protection requirements of the space, while forklift guide rails and hoop barriers provided additional protection around key working areas.