What problem did the client have?
Ridgeway Academy needed to update its science classrooms with better services, increase storage and smarten up the spaces to create a better learning environment for both students and teachers.
Which services did we provide the client with?
- Removal of existing built-in furniture and fume cabinets
- Electrical and plumbing disconnections
- R&D asbestos survey
- Beam boxing in works
- New suspended ceilings with 100mm thick insulation
- New luxury commercial vinyl flooring
- Bespoke built-in benching with Trespa worktops
- New gas taps, water taps and sinks
- New surface mounted angled twin power points
- New LED ceiling lighting and emergency lighting
- Mobile fume units
- Docking station works
- Wall and woodwork decoration
How did these services help to solve the problem they had?
All existing services within the classrooms were updated and additional services were added. The full room redecoration transformed the classrooms into brighter, cleaner spaces where students can focus better.






